Engineering

Commercial Water Treatment Facility

Full engineering delivery of a NAFDAC-compliant 15,000 L/day water treatment and bottling facility.

Duration Ongoing
Team Solo lead engineer
Tools Used 5 tools

The Challenge

A commercial client needed a fully operational water treatment and bottling facility that met NAFDAC and SON regulatory standards, from greenfield design through to commissioning.

The Approach

Led all engineering aspects including site assessment, treatment train design, equipment specification, NAFDAC documentation, GMP procedures, contractor coordination, and full project delivery.

Technical Details

Tech Stack

Water Treatment Design NAFDAC Compliance GMP Documentation EPANET AutoCAD

Results & Impact

15,000 L/day treatment and bottling capacity

Full NAFDAC and GMP compliance documentation delivered

End-to-end engineering from design to commissioning

Interested in similar work?

Let's Talk →