Engineering
Commercial Water Treatment Facility
Full engineering delivery of a NAFDAC-compliant 15,000 L/day water treatment and bottling facility.
Duration
Ongoing
Team
Solo lead engineer
Tools Used
5 tools
The Challenge
A commercial client needed a fully operational water treatment and bottling facility that met NAFDAC and SON regulatory standards, from greenfield design through to commissioning.
The Approach
Led all engineering aspects including site assessment, treatment train design, equipment specification, NAFDAC documentation, GMP procedures, contractor coordination, and full project delivery.
Technical Details
Tech Stack
Water Treatment Design
NAFDAC Compliance
GMP Documentation
EPANET
AutoCAD
Results & Impact
15,000 L/day treatment and bottling capacity
Full NAFDAC and GMP compliance documentation delivered
End-to-end engineering from design to commissioning